Scripto E430 2B Degree Long Leads Pencil Refill .046″ (1.1 mm) NOS Lot Of 3
USD 24.95 USD
Specifications
| Brand | Scripto |
| Type | Continuous Twist |
| Lead Diameter | 1.1 mm |
| Country Of Origin | United States |
| Vintage | Yes |
• Hardness: 2B. • Model: E430, similar to E439. • Quantity: 3 tubes (6 leads per tube). • Lead Size.046” (approx. ).