UNI Consultoria Empresarial Logo
Vintage Scripto 1.1mm HB Long Leads 18 pcs Mechanical Pencil Refill .046″

Vintage Scripto 1.1mm HB Long Leads 18 pcs Mechanical Pencil Refill .046″

USD 14.95 USD
SKU: Ln1PKmc3
Brand: Scripto
Condition: New
Categories: Pencils

Specifications

BrandScripto
TypeContinuous Twist
Lead Diameter1.1 Mm
Country Of OriginUnited States
VintageYes

• Hardness: HB. • Quantity: Each tube (18 leads per tube). • Similar to Model E430, E439 Lead Size.046” (approx. 1.1mm–1.18mm).

Related Items